Quick and easy wiring diagrams for all Auditor models.
Select the type of monitoring you need to find the right wiring diagram
All Auditor Hardware
Single and Multi-phase
Single-phase
I am monitoring Single phase Grid, Solar and Loads
Multi-phase
I am monitoring Multi-Phase Grid & Single Phase Solar
I am monitoring Multi-Phase Grid & Single-Phase Loads
Auditor 3RM (Rogowski coil) hardware
I am monitoring Grid Only with Rogowski coils
I am monitoring Solar Only with Rogowski coils
I am monitoring Loads Only with Rogowski coils
6M WIRING DIAGRAMS (NON ROGOWSKI)
Grid CT arrows point away from the Grid
Solar CT arrow points away from the Solar
Grid CT arrows point away from the Grid
Solar CT arrow points away from the Solar
Grid CT arrows point away from the Grid
Load CT arrow points towards the load/s
Grid CT arrows point away from the Grid
Solar CT arrow points away from the Solar
Grid CT arrows point away from the Grid
Solar CT arrow points away from the Solar
Load CT arrow points towards the Load
Important note: To complete this type of configuration, you will need to contact Wattwatchers as this will require a backend alteration to make the readings correct. Select "Mixed phase" in Onboarding.
Grid CT arrows point away from the Grid
Load CT arrow points towards the load/s
3RM (ROGOWSKI MODELS ONLY)
Grid CT arrows point away from the Grid
The shield also terminates into negative terminals (1-,2-,3-)
Solar CT arrows point away from the Grid
The shield also terminates into negative terminals (1-,2-,3-)
Load CT arrows point towards the Load
The shield also terminates into negative terminals (1-,2-,3-)