Summarises hardware for different-sized solar systems using 6M+One bundles for billing or LGC creation over 750MWh
For LGC solutions, will you generate over 750MWh?
If the Power Station generates over 750MWh, you need to install a NEM standard meter. Our 6M+One pack is our solution which comes with NMI-approved hardware for the creation of LGCs for annual energy generation of more than 750MWh up to 1500MWh, the equivalent of a 500kW to 1MW (solar) power station. Below you will be able to find what type of 6M+One pack you need depending on the size of your system. Click to learn more about LGC creation.
Choose what is the size of your system
To find what 6M+One pack you need, click on the size of your system below. Remember to always check PMC specs and CT specs to make sure cables will fit.
- Up to 10KW Solar (8.2KVA)
- Up to 40KW Solar (43KVA)
- 41-70KW Solar (72KVA)
- 71-130KW Solar (144KVA)
- 131-430KW Solar (430KVA)
Up to 10KW Solar (8.2KVA)
You will need a 6M+One pack with the following,
Meter: PMC-220 (Single-phase direct connect)
Monitoring CTs: 60A (choose between 3x or 6x)
Up to 40KW Solar (43KVA)
You will need a 6M+One pack with the following,
Meter: PMC-340BA (Three-phase direct connect)
Monitoring CTs: 60A (choose between 3x or 6x)
41-70KW Solar (72KVA)
You will need a 6M+One pack with the following,
Meter: PMC-340BA (Three-phase direct connect)
Monitoring CTs: 120A (choose between 3x or 6x)
Billing CT's: Not required
71-130KW Solar (144KVA)
You will need a 6M+One pack with the following,
Meter: PMC-340BB (Three-phase transformer connect + billing CTs)
Monitoring CTs: 200A (choose between 3x or 6x)
Billing CT's: 600A (one set of three)
131-430KW Solar (430KVA)
You will need a 6M+One pack with the following,
Meter: PMC-340BB (Three-phase transformer connect + billing CTs)
Monitoring CTs: 600A( choose between 3x or 6x)
Billing CT's: 1500A (one set of three)