Using Wattwatchers Auditor devices for Green Building Projects (GBCA)

Wattwatchers Auditor devices can be used for the Basic and Advanced monitoring strategy outlined by the Green Building Council of Australia (GBCA).

The GBCA provides the Basic and Advanced Monitoring strategy that helps non-domestic buildings achieve a higher Green Star Rating. The following table provides a summary of the Auditor’s compliance with monitoring strategies set by recognised standards such as CIBSE TM39.

1 – Basic Monitoring Strategy
Strategy Status Notes
The incoming input (electricity, gas, water, etc.) Complies Current Transformers to be clamped onto the incoming electrical mains.
The end use (lighting, HVAC, fans) Complies Current Transformers to be clamped on the end use circuits (sub loads).
The estimated energy consumption for end use Complies Periodical consumption of sub loads or tenanted premises
Which meter(s) provide the required information Complies Meter and circuits labelling
The individual estimated end consumption Complies Periodical consumption of sub loads or tenanted premises
2 – Advanced Monitoring Strategy
Strategy Status Notes
Collecting data from all meters Complies All data is reporting to Wattwatchers' server
Alerting to missing data due to failures Complies Supported by the Wattwatchers ADEPT solution
Processing data on energy use or water consumption at user adjustable intervals Complies 5 to 150 seconds adjustable measurement/logging interval
Raising an alarm when the energy or water increase beyond certain parameters and automatically email and/or SMS facilities manager Complies Supported by the Wattwatchers ADEPT solution
Providing a breakdown of the information by building system (mechanical, electric, etc.) or by space (or by tenanted floor) Complies Supported by the Wattwatchers ADEPT solution or Software Partners
Including the consumption water or energy, the load versus time (load profile), and the power factor (in the case of energy) Complies

Wattwatchers devices record a range of parameters including active and reactive power, active and reactive energy, voltage, current, frequency and power factor.

Please read the 'What data does the device capture?' to learn more.

Producing, as a minimum, a quarterly report that is automatically emailed to the facilities manager responsible for the building Complies Supported by the Wattwatchers ADEPT solution

 

Please submit a support ticket if you have any questions.